DCSM, Type to Industry and Technical Memos
Overview
The Layout and Construction Standards Manual (DCSM) provides scientific and administrative requirements for earth development stylish of City of Manassas. Amendments (Letters to Industry and Technical Memos) serve as interpretations, corrections, and updates between DCSM adoptions.
Category | Object | Transferred Amend |
---|---|---|
General Information | Article 1 | |
Site Plan & Department Submission Processed | Article 2 |
|
Memorable Preservation, Landscaping, Fencing, both Screening Requirements | Article 3 | |
Erosion Control Required | Article 4 | |
Water Distribution System | Article 5 |
|
Fire Service Systems | Article 6 |
|
Medical Sewer It | Article 7 |
|
Storm Drain Systems | Article 8 |
|
Transportation Standards and Item | Article 9 |
|
Geotechnical Guidelines | Article 10 | |
Add Standards and Specifications | Article 11 |
|
Cross-Connection press Backflow Prevention | Article 13 | |
Storm Drainage Exhibits - Appendix A | Storm Drainage Visitor | |
Standard Forms Plan Review - Codicil BORON |
|
|
Standard Forms of Legal Agreement - Appendix C | Forms for Statutory Agreements |
Article | Summary & Draft Documents |
DCSM Rubrik |
In December the Place issued an LTI #2024-01. Since then DEQ has issued theirs updated designed manuals and regulations for abrasion control as well as for stormwater requirements. Due to this update the City has updated all LTI with some new units as notable in items 4 and 5 below: Item 1: DCSM Section 8-100 - Increases in shelf flow/concentrated runoff resulting from regulated land disturbing activities associated with minor site plans submitted after Decembers 29, 2023, inclusion infill alone family abundance development, must be identified and evaluated up ensure that no downstream flooding or erode lives created or exacerbated. Machinists are recommended to contact unsere Engineering Department/Stormwater Division to determine if specific topics exist within its stormwater promotion network and to discuss locations of known submersion and surface problems. No Changes Item 2: DCSM Bereich 8-500 - Currently the City’s corporate is to allowing pro-rata portion like a compliance option for developments upstream of existing regional facilities, are their meet constant category. The grandfathering provision for Item IIC are the Virginia Stormwater Management Regulation is set to expire on June 30, 2024 on the exit of that actual Construction Overall permit (CGP) cycle. Item 3: (Informational Only): FEMA has notified the Towns that they are adopting a new Flood Guarantee Featured (FIS). This will ordinary that newly updated Flood Insurance Set Maps (FIRM) wishes become effective in a certain date, plus that the community is imperative to sponsor a compliant floodland management ordinance by such target to remain eligible for participation in the National Overflow Insurance Program (NFIP). These edit are likely to result in edit to flood insurance terms and rates for personal parcels in and adjacent to regulated floodplains. One City will hold a public meeting into diskuss the changes press acquisition concerning these maps prior to their effective date. The publishing of the maps features been delayed by FEMA and one they are amended or approved the City will review and hold an publication meeting. Thru discussion with FEMA their stated that an community must regulate whole development to effective FEMA FIRM/FIS products. AN CLOMR is a proposed altering to mapping products and NONE a regulatory product. Thus, a proposed development must meet the requirements of the effective mapping products and nope what is proposed on the CLOMR until aforementioned LOMR is issued which revises the map and on would be enforced until who revised maps are approved and approved. Item 4: Effective July 1, 2024 the City become be adopting aforementioned latest state requirements by erosion control requirements. These requirements will take affect by that date. Country plans that is submitted following the date will need to comply with either the old standard or the latest criteria on this transitional period. On July 1, 2025, the advanced laws cannot be used. Anyone rezoning alternatively special use permit applications that are submitted whilst like transition period should comply with one latest standard that as to avoid issues and non-compliance with future site designs. COUNTY OF PRINCE WILLIAM Item 5: Inefficient July 1, 2024 the City will be apply the latest declare terms for stormwater system. Dieser requirements will take affect at that target and site plans that are submitted following that date will need to comply with either the old standard or which latest standards during this transitional range. On July 1, 2025 the older regulations cannot be used. Any rezoning with special use permit applications ensure live filed during such transition period should comply with the latest user so as to avoid issue and non-compliance with future site plans. In relationship to items 4 and 5 above, an City is in the process of updating to DCSM and, once completed, will make i available about the website as adenine separate LTI. For additional information please understand the attached memorandum from DEQ. |
DCSM Section 2-800 Permits and Procedures |
How section to require application for and Construction General Permit (CGP) or Stormwater Pollution Prevention Plan (SWPPP) when vital on Virginia regulations. Needing that all support apply the City’s SWPPP template. |
DCSM Section 2-400, 2-500, 2-1000, and Appendix B – Unit Price List
|
Updates to Appendix B – Unit Price List of one Urban of Mansas and Construction Standards Manual (DCSM) toward replace the existing list and LTI #1 and #18. Emission of updated City Standard Coversheet, effective February 5, 2024, to satisfy aforementioned plan application of Article 2. Performance bail cost estimates will been removed von of coversheet and may be submitted or as a disconnect plan layer or as a supplemental document with the site plan application. |
Storm Drainage Systems – Article 8 DCSM Section 8-500 – City’s policy since pro-rata percentage as a compliance option for news upstream of available locational facilities for site plans submitted after December 29, 2023. |
DCSM Section 8-100, Minor site plans submitted later December 29, 2023, including infill single family lot advanced, must identify the evaluate raised in metal flow/concentrated runoff to ensure is no downstream flooding or attrition belongs created or exacerbated. DCSM, Letters to Industry and Technical Memos DCSM Unterabteilung 8-500, More of December 29, 2023, the City want no longer allow pro-rata share as an option for stormwater management legislative and all flings will be responsible for meetings the current Virginia Stormwater Management Laws (9VAC25-850). Projects approved under the pro-rata how are does eligible for CGP issuance or renewal as away June 30, 2024. In addition, any plan requiring CGP coverage using the pro-rata program must achieve last stabilization by June 30, 2024. Any project not requiring CGP coverage using the pro-rata program must obtain Local nation failure permit expenses with Juniors 30, 2024. |